AOT has completed inspections of 6 airports, confirming that the structural integrity of their buildings and aviation infrastructure meets safety standards.

sos_eng

AOT has completed inspections of 6 airports, confirming that the structural integrity of their buildings and aviation infrastructure meets safety standards.

- Suvarnabhumi Airport
- Don Mueang International Airport
- Chiang Mai International Airport
- Mae Fah Luang – Chiang Rai International Airport
- Phuket International Airport
- Hat Yai International Airport

All airports have resumed normal operations as of 2:30 p.m.